The Kampala Report
  • Latest
    • Community
    • News
    • Trends
    • Education
    • Health
    • Africa
    • World
  • Money
    • Business
    • Finance
    • Farming
    • Tech
    • Winning Brands
  • Talk Back
    • Editorial
    • Op-Ed
    • Columnists
  • Politics
    • Parliament
    • Elections
  • Society
    • Entertainment
    • Relationships
    • Travel
  • Sports
  • Impact
    • Investigations
    • Special Reports
  • FACT CHECK
SUBSCRIBE
No Result
View All Result
  • Latest
    • Community
    • News
    • Trends
    • Education
    • Health
    • Africa
    • World
  • Money
    • Business
    • Finance
    • Farming
    • Tech
    • Winning Brands
  • Talk Back
    • Editorial
    • Op-Ed
    • Columnists
  • Politics
    • Parliament
    • Elections
  • Society
    • Entertainment
    • Relationships
    • Travel
  • Sports
  • Impact
    • Investigations
    • Special Reports
  • FACT CHECK
No Result
View All Result
The Kampala Report
No Result
View All Result
Home Money Business

Uganda Gov’t defends TotalEnergies for designing Tilenga project from London

byMIKE OPIO | theKR SPECIAL CORRESPONDENT
May 1, 2023
in Business, Finance
Reading Time: 2 mins read
0
On going works of Tilenga Project. (IMAGE: Courtesy | theKR Media)

On going works of Tilenga Project. (IMAGE: Courtesy | theKR Media)

WhatsAppShare on FacebookShare on Twitter

The Petroleum Authority of Uganda has granted TotalEnergies clearance to conduct detailed engineering designs for the 190,000-barrel Central Processing Facility (CPF) outside of the country. Although there have been concerns that TotalEnergies may have flouted national content rules or denied Ugandan engineers from working on the project, the PAU has defended the company’s actions.

Alex Nyombi, the Director for Development and Production at the Petroleum Authority of Uganda, confirmed that TotalEnergies was allowed to conduct the studies outside of Uganda due to the need for specialized disciplines that are not yet available in the country.

Nyombi also explained that some of the detailed engineering work is being done in Uganda, but much of it is being conducted in London due to the specialized nature of the work. Transporting the experts to Uganda would have been more expensive than carrying out the work in London.

The Tilenga project’s Central Processing Facility (CPF) will process 190,000 barrels of oil and 700,000 barrels of total liquid per day. Unlike the Kingfisher project, which began drilling in late January, Tilenga’s operations are located in a national park, so the project has been approached with caution.

RELATED STORIES

Oil development at the Kingfisher area being operated by CNOOC Uganda limited.

Oil companies up in arms over high food prices In Bunyoro

May 25, 2023
92
Balikenda (blue shirt) with part of his farmily at his home. In the background is a wiremesh fence by TotalEnergies.

Man faces off with govt, TotalEnergies over Shs200m compensation

April 6, 2023
99
TotalEnergies officials with the beneficiary youth.

TotalEnergies prepares 200 Ugandan youth for oil jobs

March 15, 2023
110
President Museveni while commissioning the oil drilling works on Tuesday. PHOTO/COURTESY

Excitement as Uganda starts oil drilling

January 25, 2023
103

He confirmed that the rigs for the Tilenga project are already in the country, and their testing may take a while before the Petroleum Authority allows the rigging exercise to begin.

The rigs have been designed to ensure that they do not interfere with tourism and wildlife, as some environmentalists have expressed concern about the impact of noise pollution on iconic species such as elephants and giraffes

Since February of last year, TotalEnergies has been clearing the site for the Central Processing facility and other industrial areas in preparation for the first oil expected in 2025. The project is being undertaken by Mota-Engil Uganda in an area covering approximately 700 acres of land. The complex will also host construction camps, a drill support base, and a construction support base.

Nicolas Terraz, Vice President of TotalEnergies E&P Africa, has said that the project will be executed in line with the company’s commitment to biodiversity and minimizing its impact on the local community.

“Significant resources have been mobilized to implement them in an exemplary way. For four years, the affiliate has been in close contact with the local people and has been striving to minimize the project’s impact on the local community. We are proud to be a part of these major developments for the Company that promises to transform their host countries, “said.

The Tilenga project is operated by TotalEnergies (56.6%), in partnership with CNOOC and UNOC, and is expected to create 8,000 jobs while spending over $700 million on local business. The Tilenga project involves the development of six fields and the drilling of around 400 wells from 31 locations.

The production will be delivered through buried pipelines to a treatment plant built in Kasenyi, where the fluids (oil, water, gas) will be separated and treated. The operators have committed to re-injecting all of the water produced into the fields and using the gas to produce the energy needed for the treatment process.

Surplus electricity will be exported to the pipeline and the Ugandan grid. Tilenga is one of the two mature production projects operating in the Albertine Graben, the other being the Kingfisher project operated by China’s CNOOC.

Uganda has four exploration licenses for oil and gas operations, including Kasureban, held by Uganda National Oil Company, Ngasa Shallow and Ngasa Deep, held by Oranto Petroleum, and Kanywataaba License, held by Armor Energy.

It is expected that Armor Energy and Oranto will begin drilling wells by the end of this year.

Share this:

  • WhatsApp
  • Tweet

Like this:

Like Loading...
Tags: Petroleum Authority of Uganda (PAU)Tilenga ProjectTotalEnergies

Do you have a story in your community or an opinion to share with us: Email the editor on  editorial@thekampalareport.com

LATEST UPDATES

  • Transport paralysed as alternative route on Kampala-Masaka Highway collapses
  • UGANDA CUP FINAL PREVIEW: Vipers eye double as Police hunt maiden trophy
  • Investors to construct Iron Ore plant in Rubanda
  • Uganda gets first blood irradiation machine
  • Namugongo traders decry high rent charges

MOST POPULAR

  • Diana Kamuntu, Janet's youngest daughter and last born. PHOTO/COURTESY

    REVEALED! Why Museveni daughter Diana applied for name change at NIRA

    594 shares
    Share 238 Tweet 149
  • REVEALED: Slain blogger Isma Olaxes had expressed death fears

    67 shares
    Share 27 Tweet 17
  • More details emerge on bodyguard who killed Minister Engola

    35 shares
    Share 14 Tweet 9
  • LAND MARK: Court declares law against sale of Mairungi, cannabis null and void

    31 shares
    Share 12 Tweet 8
  • DETAILS! Killer of blogger Olaxes waited patiently for two hours

    27 shares
    Share 11 Tweet 7

INVESTIGATION

Judge hits out at state over ‘unsystematic investigations’ in Kirumira murder case

Late ASP Muhammad Kirumira
byMIKE OPIO | theKR SPECIAL CORRESPONDENT
April 25, 2023
0
109

On Monday, High Court Judge Margaret Mutonyi acquitted Abubaker Kalungi of the double murders of former Buyende district police boss...

Read more

State adduces 150 pieces of evidence against Kaweesi murder suspects

Felix Kaweesi. PHOTO/COURTESY
byMIKE OPIO | theKR SPECIAL CORRESPONDENT
March 29, 2023
0
117

On Tuesday, the matter came up for further pretrial hearing and the prosecution led by Lillian Omara tabled 150 pieces...

Read more

The Indigenous Benet; could they still help conserve Mt Elgon habitat

What the environment looks like today among the modern Benet in Kween district
byDAVID MAFABI | theKR Community Editor
March 27, 2023
0
135

Growing up in Mt Elgon forests in Kween district, Moses Muwanga, a Benet, deeply respects wild animals, Birds and the...

Read more

Kirumira murder trial: Parties make final submissions

Late ASP Muhammad Kirumira
byURN | theKR Partner News Agency
March 14, 2023
0
126

Having concluded the defense hearing last month, the court on Monday heard final submissions from the prosecution led by Thomas...

Read more

About Us

The Kampala Report is a news media start up, and aims to become the leading news and information source in Uganda. We are known for our accurate, authoritative news content, diversity of opinion and analysis, covering the latest news and events from Uganda’s capital Kampala, the Ugandan countryside and East Africa regional contexts.

Learn more

Recent Stories

  • Transport paralysed as alternative route on Kampala-Masaka Highway collapses
  • UGANDA CUP FINAL PREVIEW: Vipers eye double as Police hunt maiden trophy
  • Investors to construct Iron Ore plant in Rubanda
  • Uganda gets first blood irradiation machine

Follow Us

Facebook Twitter Instagram

No Result
View All Result
  • Latest
    • Community
    • News
    • Trends
    • Education
    • Health
    • Africa
    • World
  • Money
    • Business
    • Finance
    • Farming
    • Tech
    • Winning Brands
  • Talk Back
    • Editorial
    • Op-Ed
    • Columnists
  • Politics
    • Parliament
    • Elections
  • Society
    • Entertainment
    • Relationships
    • Travel
  • Sports
  • Impact
    • Investigations
    • Special Reports
  • FACT CHECK
%d bloggers like this: